Case study
Industrial Park Decarbonisation Roadmap
A phased pathway for a multi-tenant industrial park combining rooftop solar, nearby land and battery storage.
In progressIndustrial corridor (sample)2026Sample
This is a sample case study for layout review. It does not describe a real client or project.
The challenge.
Tenants share a constrained grid connection and face rising energy costs. The park operator wanted a coordinated plan rather than piecemeal projects.
Our approach.
Built a demand and emissions baseline from tenant data
Mapped rooftop and adjacent-land generation potential
Compared storage options for peak shaving and resilience
Outcomes.
- Options ranked by cost, abatement and deliverability
- A three-phase investment roadmap
- Shared dashboard for the operator and tenants
Facing a similar decision?
Tell us about your location, technology or decarbonisation goal. We’ll come back with a scoped approach and a clear quote.